
Project 01 of 08Melbourne CBDOn site Sep 2019 to Feb 2020
108 Elizabeth St
A heritage-fronted CBD floor turned into an open-plan workplace for Amorepacific. Link 2 delivered the electrical, lighting and data cabling from first rough-in to handover, working to Topic Interiors' program.


A narrow heritage floor with a modern tenant.
Elizabeth Street buildings give you character and take away convenience: riser space, ceiling heights and existing services are all tight. The brief asked for an open plan, glazed meeting rooms, a breakout and a comms room, with the lighting doing most of the design work.
Our job was to make the services disappear into the architecture and keep the program moving for the builder.
Cable before ceiling, every time.
Data and power ran first, above the line where the batten ceiling would land, with the comms rack set early so the fit-out could test as it went. Linear fittings were set out from the architect's grid before plaster, which is the difference between a ceiling that reads as one line and one that does not.



- On site
- 5 months
- Disciplines
- 3
- Builder
- Topic Interiors
- Handover
- Feb 2020
Light that reads as one line.
Glazed meeting rooms, track lighting over the workstations, a feature pendant in the kitchen and a signage circuit at reception. The tenant moved in on program.







Why it matters
Builders bring us back because the services disappear and the program holds.

Start a conversation
One call wires the whole site.
Please tell us about the site and what it needs. We reply within one business day, and sooner if it is urgent. Thank you for considering Link 2 Solutions.
Call us
(03) 5940 5177Email us
sales@link2solutions.com.auVisit us
4 Complex Close, Pakenham VIC
Licence
REC 27599